Duration | Water | Electricity | Total cost per treatment, $ | ||||
---|---|---|---|---|---|---|---|
Per treatment dialysate desired, L | Per treatment water consumption, mean ± SD, m3 at 20°C n = 5 | % Dialysate desired to water consumed | Per treatment water cost*, $ | Per treatment electricity consumption, mean ± SD, kWh at 20°C n = 5 | Per treatment electricity cost†, $ | ||
6 h × 300 mL/min | 108 | 0.8052 ± 0.0390 | 13 | 2.61 | 4.25 ± 0.46 | 0.38 | 2.99 |
8 h × 300 mL/min | 144 | 1.0128 ± 0.0478 | 14 | 3.29 | 5.16 ± 0.48 | 0.46 | 3.74 |
4 h × 500 mL/min | 120 | 0.6675 ± 0.0328 | 18 | 2.17 | 3.68 ± 0.22 | 0.33 | 2.49 |
6 h × 500 mL/min | 180 | 0.8987 ± 0.0216 | 20 | 2.92 | 4.70 ± 0.28 | 0.42 | 3.33 |
2 h × 800 mL/min | 96 | 0.4829 ± 0.0168 | 20 | 1.57 | 2.64 ± 0.23 | 0.23 | 1.80 |
3 h × 800 mL/min | 144 | 0.6047 ± 0.0288 | 24 | 1.96 | 3.40 ± 0.26 | 0.30 | 2.26 |
4 h × 800 mL/min | 192 | 0.7344 ± 0.0244 | 26 | 2.38 | 4.04 ± 0.38 | 0.36 | 2.74 |
Note: SD = standard deviation.
*Assumes a water cost of $3.2438/m3 and includes a 60-min pretreatment machine warm-up and operations check in addition to a 45-min posttreatment heat disinfection cycle.
†Assumes an electricity cost of $0.089/kWh and includes a 60-min pretreatment machine warm-up and operations check in addition to a 45-min posttreatment heat disinfection cycle.